110-M-225

Header

Vertical plug-in with anchors

https://wecoconnectors.com/wp-content/uploads/Images/110-M-225-R.JPG

DESCRIPTION

The pin strip 110-M-225 with connecting flanges and a pitch of 3,5 mm is available in 2- to 22-pole design. The plug direction for mating plug connectors is for this version vertical to the PC board. For its small dimensions it offers remarkable connection data (160 V-III-3 / 8 A). The connecting flanges on both housing sides are equipped with M2,5 thread inserts (<0,3 nm). the corresponding plug connectors in connecting flange design feature lateral screws which offer vibration-proof screw-connection of connector and also prevent unintended loosening. addition, pin strip can be attached to housing walls with (not included delivery extent). for each pole, has one trapezoidal coding slot elements 120-k inserted.

GENERAL INFORMATION

Pitch: 3.50 mm

No. of poles: 2 - 22

Usable with: plugs with 110-A-115 series

TECHNICAL DATA

Over Voltage Category

III

III

II

Pollution Severity Level

3

2

2

Rated Voltage

160 V

160 V

320 V

Rated Impulse Voltage

2.5 kV

2.5 kV

2.5 kV

Rated current: 8 A

Rated insulation voltage: 130 V acc. to EN 60998-1

Hole in PCB: ø 1.3 mm

RATINGS

Current
[A]
Voltage
[V]
Group
 
AWG
 
Torque
[Nm]
8 300 B, D
8 300 B
Download PDF

TECHNICAL DRAWINGS

110-M-225.JPG - technical drawing 1

MATERIALS

Moulding: PA, grey, V-0

Comparative tracking index: CTI ≥ 600

Insulating group: I

Temperature range: -40°C up to 100°C

Solder pin: 0,8 x 0,8 mm; tin plated brass

OPTIONS / ACCESSORIES

  • Consecutive numbering
  • Special marking according to drawing
  • Self-adhesive marking strip BST-3,50
  • Pitch of 7 mm for larger clearance and creepage distances
  • Coding elements 120-K

STANDARD CONFIGURATIONS

Poles Items Part # Length L [mm] Step 3D PDF
02 110-M-225/02 20.841.052 17.30
03 110-M-225/03 20.841.053 20.80
04 110-M-225/04 20.841.054 24.30
05 110-M-225/05 20.841.055 27.80
06 110-M-225/06 20.841.056 31.30
07 110-M-225/07 20.841.057 34.80
08 110-M-225/08 20.841.058 38.30
09 110-M-225/09 20.841.059 41.80
10 110-M-225/10 20.841.060 45.30
11 110-M-225/11 20.841.061 48.80
12 110-M-225/12 20.841.062 52.30
13 110-M-225/13 20.841.063 55.80
14 110-M-225/14 20.841.064 59.30
15 110-M-225/15 20.841.065 62.80
16 110-M-225/16 20.841.066 66.30
17 110-M-225/17 20.841.067 69.80
18 110-M-225/18 20.841.068 73.30
19 110-M-225/19 20.841.069 76.80
20 110-M-225/20 20.841.070 80.30
21 110-M-225/21 20.841.071 83.80
22 110-M-225/22 20.841.072 87.30

Did you find the information you were looking for ?

Click on a star to rate your experience.

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.